Commercial interiors for Felixstowe businesses
Felixstowe runs on the port, and so do most of the offices we work in here.
Shipping agents, freight forwarders, logistics operators and the businesses that support them. Teams that can’t down tools while their office is improved, and clients who expect the boardroom to look the part when they visit.
We’ve refurbished and fitted out offices in Felixstowe for Freightliner, KWL Logistics, MCP, Grange Shipping, Cogent Technology and Schallenberg International. We’ve been working with Felixstowe businesses for years, and the team is regularly on site across Suffolk, not just at handover.
Port businesses don’t really have quiet periods. Ships arrive when they arrive, and customs, bookings and haulage don’t wait for a refurbishment to finish. Most of our Felixstowe projects have been planned around a team that keeps working the whole time, with noisy or disruptive jobs moved to evenings and weekends.
The buildings vary more than people expect. We’ve worked in a former chapel with a domed ceiling, in offices close to the docks and in town-centre premises that have been extended and rearranged over the years. Each one needs a different approach to power, data, lighting and layout.
Growth tends to arrive quickly too. A new contract lands and suddenly there are six more people to seat. A lot of our work here starts with an office that has had desks added wherever they would fit, and needs a proper plan before anything else.
Felixstowe projects
KWL Logistics: a new office with the port on the boardroom wall
KWL moved into new premises a few minutes from the port and wanted the space to feel as current as the business. Chloe led the project across both floors: partitioning for a private boardroom, new flooring, decoration, electrical and data works, furniture and breakout seating. The finishing touch was a full-wall graphic made from Managing Director Jason Flower’s own drone photograph of the Port of Felixstowe.
Read the KWL Logistics case study
MCP: modern working inside a former chapel
MCP’s office sits inside a converted chapel, so every cable route and light fitting had to respect the building. Over seven weeks we replaced all the power and data, fitted 53 new floor boxes across two floors, added LED lighting inside the dome and fitted blinds on curved rails to follow the windows.
Read the MCP case study
Freightliner: a full refresh without closing the office
Freightliner needed new toilets, a new kitchen and a refreshed office, with the team working throughout. Flooring went down over a weekend and we brought in extra hands to move furniture around people as they worked.
Read the Freightliner case study
We’ve supported Elite Universal since they started up in 2019. When the team outgrew their first office, we planned and fitted out the next one, including vinyl-wrapped doors that gave a fresh look for a fraction of the cost of replacing them.
View Elite Universal case study
Boast wanted a boardroom that matched the business they’d become. Lockdown delays squeezed the timetable, and the work was completed over five weeks once restrictions allowed.
View Boast International case study
Grange Shipping: room for a growing team
Grange Shipping had grown the way many busy firms do, adding desks wherever there was space. We replanned the layout to fit more workstations properly, then followed through with new flooring and screens.
Read the Grange Shipping case study
Cogent Technology: a boardroom refurbishment
A boardroom refurbishment for Cogent Technology in Felixstowe.
Read the Cogent Technology case study
What we do for Felixstowe businesses
Office refurbishment – updating a space that has worked hard for years. New flooring, decoration, lighting, kitchens and toilets, done in phases if the team needs to stay in.
Office fit-out – taking an empty or shell space through to a working office, from partitions and ceilings to power, data and furniture.
Space planning and design – working out how many people the office can really hold and where everything should go before anything is ordered.
Partitioning and glazing – private offices, boardrooms and meeting rooms created without structural work.
Acoustic improvements – calmer open-plan offices and meeting rooms where calls can be taken properly.
Office furniture – desks, seating, storage and boardroom furniture chosen for the space and the budget.
Office relocations – fitting out the new premises and managing the move so the team is working again quickly.
For a full overview of our services, see our office fit-out, office refurbishment and office partitioning pages.
How we work
You get one point of contact from the first visit to the day you move back in, usually Chloe or Lisa. We coordinate the trades, suppliers and programme so nobody on your side has to chase anyone.
For busy operations we plan the work around you, not the other way round. That has meant weekend flooring, extra labour to move furniture around people at their desks, and phasing jobs so part of the office is always usable. If something needs a decision or will cost more than expected, we tell you early.
More on how we work.
“Thank you so much to all at Source One for their hard work in completing our office modernisation.“
“Thank you so much to all at Source One for their hard work in completing our office modernisation.“
John Grange, Owner and Director, Grange Shipping, Felixstowe
Areas covered around Felixstowe
We work across Felixstowe and Walton, the port and dock area, Trimley St Martin, Trimley St Mary, Kirton, Levington, Nacton, Martlesham, Woodbridge and Ipswich.
For wider Suffolk projects see our Suffolk page, and for Ipswich work see our Ipswich page.
We’re part of the town off site as well. Source One sponsors Felixstowe Rugby Club and has supported Felixstowe and Walton Football Academy. Find out more about our community work.
FAQs
Yes, and most Felixstowe clients need exactly that. We phase the work, move the noisiest jobs to evenings or weekends and bring in extra labour to shift furniture around your team. Freightliner stayed open throughout their refurbishment.
Not always. Often the first step is a proper space plan, which can show room for more people than you’d think. Grange Shipping fitted in extra workstations with a new layout, flooring and screens rather than a complete rebuild.
Yes. MCP’s office is a former chapel, where new power, data and lighting had to be fitted without spoiling the original features.
It depends on the size and how much of the office has to stay in use. As a guide, MCP’s full refurbishment across two floors took seven weeks. We’ll give you a realistic programme once we’ve seen the space.
No. We take on everything from a single boardroom or kitchen through to a complete fit-out, and we give each one the same attention.
Yes. Space planning and CAD design are included as part of our service.

Planning changes to your Felixstowe office?
Tell us what isn’t working and what you’d like it to be. We’ll come and look at the space, give you an honest view of what’s involved and a realistic idea of cost and timing.
No obligation and no hard sell.